For AI cloud and AI factory operators

Data centre sites for AI cloud and GPU operators.

Your GPUs are ordered. Where do they go live? Powered, fibre-connected sites anywhere in Australia. From a 150 kW pilot to a multi-megawatt AI factory. We start with existing buildings and yards, so you reach first revenue sooner than greenfield.

Direct answer

How can an AI cloud operator find sites for GPU capacity in Australia?

Start with the deployment, not the property. Share your GPU roadmap, rack power, cooling and regions. We screen sites anywhere in Australia. Existing powered, fibre-connected buildings and yards come first. The strongest are proven with specialist due diligence and packaged into a repeatable rollout. Divine Lab Worx is the consultancy arm of Sharktech Global.

The operator problem

Hardware is arriving faster than sites are ready.

GPU allocations, customer contracts and capital are lining up. The site is what decides the go-live date.

01

GPU delivery outruns site readiness

Hardware arrives before power, cooling and approvals are in place, and starts depreciating.

02

Power and planning gate every deal

Pipeline agreements depend on capacity and consent you cannot yet confirm.

03

Customers want a date

Enterprise and government buyers sign when you can commit to a go-live.

04

Buildings look ready, but are not proven

Vacant floors and yards need load, structural, cooling and access checks before they can host GPUs.

What we deliver for operators

A pipeline of sites your GPUs can actually use.

01

Multi-site pipeline

Candidate sites across every state, ranked against your deployment profile.

02

Power per site

Substation headroom, upgrade dates and an indicative supply for each tier, confirmed by load study.

03

Cooling pathway

Liquid or air cooling, heat rejection, water and acoustic limits checked site by site.

04

Repurposed buildings

Vacated floors, equipment rooms and strong roofs, with floor loading and structural checks.

05

Sovereign hosting

Onshore sites with controlled, logged physical access and Australian jurisdiction.

06

Rollout template

One design, approval and commercial template by site category, so each site moves faster.

Faster to revenue

Greenfield versus existing infra­structure.

Indicative. Every site is confirmed by due diligence.

Item Greenfield build Existing infrastructure, screened by Divine Lab Worx
Grid connection New connection, often the longest item on the programme. Existing supply first, with spare capacity confirmed by load study.
Fibre New routes, trenching and permits. Existing fibre and duct entry where available.
Security New fence, access control and monitoring. Secure sites with established access control.
Approvals New use on new land. Pathway checked early, with submissions prepared to the asset owner's requirements.
Second site Starts again from zero. Same template, faster each time.

Deployment tiers

From pilot to AI factory.

Indicative planning figures, confirmed site by site.

01 / Pilot

About 150 kW

Six 25 kW units. Vacated floors or a yard enclosure. Proves the site and the template.

02 / Cluster

About 400 kW

One 40 ft enclosure on a yard or strong flat roof. Existing supply plus upgrade.

03 / Hub

1.3 MW and above

Large yards. Typically a new high-voltage connection, about 1.8 to 1.9 MVA.

04 / Portfolio

Multi-site rollout

Sites grouped by size, power and location, each with one approval and design template.

How we engage

From discovery call to go-live plan.

Tell us your GPU roadmap. We come back with sites.

See also AI and GPU sites, power-ready sites and feasibility studies.

01

Discovery call

Load, rack density, cooling method, regions, timeline and customer commitments.

02

Regional screen

Top sites ranked in your priority regions. Indicatively two weeks.

03

Shortlist due diligence

Site profiles, supply outlook, cooling pathway and verification checklist.

04

Pilot-ready report

Load study scope, planning review, crane and acoustic plan, cost and programme. Asset owner approach prepared.

05

Rollout template

Sites two to five follow the same template, with owners and dates.

Credibility

Critical infra­structure people, not property brokers.

Led by a former Area Manager for critical infrastructure across NSW. Backed by specialists in power systems, facility maintenance, site delivery and critical power.

5-point Power, fibre, land, planning and access screen
AU Sites screened in every state and territory
1.3 MW+ Edge nodes to megawatt hubs

Frequently asked

For operators, answered.

Clear answers for AI cloud, neocloud and AI factory teams.

01 Can you find sites for liquid-cooled GPU clusters?

Yes. Power, heat rejection, water, loading and noise. Checked site by site.

02 How much power does a GB200 or GB300 NVL72 rack need?

About 120 to 140 kW per rack, and both are liquid-cooled. NVIDIA rates the GB200 NVL72 at approximately 120 kW. Server makers list about 132 kW nominal for GB200 and GB300 racks. Plan power and cooling per rack, not per hall. Figures as at October 2026; your hardware supplier confirms the exact load.

03 How many megawatts does a GPU cloud deployment need?

It comes in blocks. NVIDIA builds its DGX SuperPOD from scalable units of eight NVL72 racks, or 576 GPUs. One unit is rated at about 1.2 MW for GB200 and about 2 MW for Vera Rubin, before cooling and other facility load. The site has to deliver each block in one hall, in one step. NVIDIA reference architectures, as at October 2026.

04 Will the site suit the next GPU generation?

We check. NVIDIA designs Vera Rubin racks for 45 °C warm-water cooling, and has announced 800 V DC power for racks of 1 MW and beyond from 2027. A site that suits today’s racks but not the next refresh shortens the life of your investment. We test cooling, power distribution and floor space for both.

05 Do you only look at greenfield land?

No. Existing powered, fibre-connected sites come first. Greenfield is compared side by side.

06 Can you help us approach asset owners?

Yes. We prepare the technical and commercial case to each asset owner's requirements. Approval and occupancy terms remain the asset owner's decision.

07 We are entering Australia. Can you help?

Yes. Site, approvals and tenant demand in one plan. You land with a site and a pipeline.

08 How quickly can we get a shortlist?

A regional screen is indicatively two weeks from the brief. Due diligence on the preferred sites follows.

Your next site

Find your next AI factory site sooner.

Tell us your GPU roadmap and target regions. We will find existing infrastructure that fits. Or call 0468 017 373.

Book a discovery call