Multi-site pipeline
Candidate sites across every state, ranked against your deployment profile.
For AI cloud and AI factory operators
Your GPUs are ordered. Where do they go live? Powered, fibre-connected sites anywhere in Australia. From a 150 kW pilot to a multi-megawatt AI factory. We start with existing buildings and yards, so you reach first revenue sooner than greenfield.
Direct answer
Start with the deployment, not the property. Share your GPU roadmap, rack power, cooling and regions. We screen sites anywhere in Australia. Existing powered, fibre-connected buildings and yards come first. The strongest are proven with specialist due diligence and packaged into a repeatable rollout. Divine Lab Worx is the consultancy arm of Sharktech Global.
The operator problem
GPU allocations, customer contracts and capital are lining up. The site is what decides the go-live date.
Hardware arrives before power, cooling and approvals are in place, and starts depreciating.
Pipeline agreements depend on capacity and consent you cannot yet confirm.
Enterprise and government buyers sign when you can commit to a go-live.
Vacant floors and yards need load, structural, cooling and access checks before they can host GPUs.
What we deliver for operators
Candidate sites across every state, ranked against your deployment profile.
Substation headroom, upgrade dates and an indicative supply for each tier, confirmed by load study.
Liquid or air cooling, heat rejection, water and acoustic limits checked site by site.
Vacated floors, equipment rooms and strong roofs, with floor loading and structural checks.
Onshore sites with controlled, logged physical access and Australian jurisdiction.
One design, approval and commercial template by site category, so each site moves faster.
Faster to revenue
Indicative. Every site is confirmed by due diligence.
| Item | Greenfield build | Existing infrastructure, screened by Divine Lab Worx |
|---|---|---|
| Grid connection | New connection, often the longest item on the programme. | Existing supply first, with spare capacity confirmed by load study. |
| Fibre | New routes, trenching and permits. | Existing fibre and duct entry where available. |
| Security | New fence, access control and monitoring. | Secure sites with established access control. |
| Approvals | New use on new land. | Pathway checked early, with submissions prepared to the asset owner's requirements. |
| Second site | Starts again from zero. | Same template, faster each time. |
Deployment tiers
Indicative planning figures, confirmed site by site.
Six 25 kW units. Vacated floors or a yard enclosure. Proves the site and the template.
One 40 ft enclosure on a yard or strong flat roof. Existing supply plus upgrade.
Large yards. Typically a new high-voltage connection, about 1.8 to 1.9 MVA.
Sites grouped by size, power and location, each with one approval and design template.
How we engage
Tell us your GPU roadmap. We come back with sites.
See also AI and GPU sites, power-ready sites and feasibility studies.
Load, rack density, cooling method, regions, timeline and customer commitments.
Top sites ranked in your priority regions. Indicatively two weeks.
Site profiles, supply outlook, cooling pathway and verification checklist.
Load study scope, planning review, crane and acoustic plan, cost and programme. Asset owner approach prepared.
Sites two to five follow the same template, with owners and dates.
Credibility
Led by a former Area Manager for critical infrastructure across NSW. Backed by specialists in power systems, facility maintenance, site delivery and critical power.
Frequently asked
Clear answers for AI cloud, neocloud and AI factory teams.
Yes. Power, heat rejection, water, loading and noise. Checked site by site.
About 120 to 140 kW per rack, and both are liquid-cooled. NVIDIA rates the GB200 NVL72 at approximately 120 kW. Server makers list about 132 kW nominal for GB200 and GB300 racks. Plan power and cooling per rack, not per hall. Figures as at October 2026; your hardware supplier confirms the exact load.
It comes in blocks. NVIDIA builds its DGX SuperPOD from scalable units of eight NVL72 racks, or 576 GPUs. One unit is rated at about 1.2 MW for GB200 and about 2 MW for Vera Rubin, before cooling and other facility load. The site has to deliver each block in one hall, in one step. NVIDIA reference architectures, as at October 2026.
We check. NVIDIA designs Vera Rubin racks for 45 °C warm-water cooling, and has announced 800 V DC power for racks of 1 MW and beyond from 2027. A site that suits today’s racks but not the next refresh shortens the life of your investment. We test cooling, power distribution and floor space for both.
No. Existing powered, fibre-connected sites come first. Greenfield is compared side by side.
Yes. We prepare the technical and commercial case to each asset owner's requirements. Approval and occupancy terms remain the asset owner's decision.
Yes. Site, approvals and tenant demand in one plan. You land with a site and a pipeline.
A regional screen is indicatively two weeks from the brief. Due diligence on the preferred sites follows.
Your next site
Tell us your GPU roadmap and target regions. We will find existing infrastructure that fits. Or call 0468 017 373.
Book a discovery call