Feasibility

Data centre desktop feasibility study.

Know where to build, and what it will take, before you spend on site.

Direct answer

What is a data centre desktop feasibility study?

It screens candidate sites from public records, imagery and network data. Then it ranks them. It sets out deployment fit, supply outlook, items to verify and a path to pilot. No site visit is needed to start. Divine Lab Worx is the consultancy arm of Sharktech Global.

Three ways to start

Fixed scope. Clear deliverables.

Timeframes are indicative and start when the brief is received. Pricing on application.

01 / 2 weeks

Regional screen

One region screened, with the top 10 sites ranked.

02 / 4 weeks

Shortlist due diligence

Site profiles, supply outlook and verification checklist for the top 5.

03 / 6 to 8 weeks

Pilot-ready report

Load study scope, planning review, crane and acoustic plan, cost and programme.

Every study includes

Evidence first. Commitment second.

01

Site universe and method

How candidates were found and screened.

02

Ranked sites

Aerial and street views, yard, access and supply outlook.

03

Deployment tier

Edge node, cluster or hub for each site.

04

Items to verify

What must be confirmed before deployment.

05

Time to revenue

An indicative comparison against greenfield, labelled as a planning scenario.

Your brief

What we need from you.

A short brief is enough to start.

01

Load

Target IT load now and in three years.

02

Hardware

Rack density, cooling method and unit dimensions.

03

Regions

Priority cities, regions or customer locations.

04

Timeline

Target go-live date and customer commitments.

05

Constraints

Budget, ownership model and sovereignty needs.

Verification

Items every study flags for confirmation.

01

Asset owner approval

Consent for the proposed use and agreed occupancy terms.

02

Electrical capacity

Load study of existing supply, and a connection enquiry if an upgrade is needed.

03

Structural sign-off

Roof and slab capacity for plant, enclosures and crane loads, certified by an engineer.

04

Live operations

Method statements, inductions and escorted access so nothing in service is disrupted.

05

Crane lift

Lift plan, crane selection, outrigger bearing and exclusion zones.

06

Services and road use

Underground and overhead services search, traffic management and road occupancy.

07

Planning pathway

Town planner review of zoning and permissibility.

08

Acoustic and ground

Acoustic assessment, plant placement, survey and geotechnical investigation.

Frequently asked

Feasibility studies, answered.

Clear answers for operators, developers and investors.

01 Do you need to visit a site to start?

No. The first screen is a desktop audit of public records and imagery. Site visits follow for the shortlist.

02 Is a desktop study engineering advice?

No. It is a screening and decision document. Each recommended site needs qualified sign-off.

03 Can the study include greenfield options?

Yes. Existing infrastructure and greenfield sites are compared on the same basis.

04 What does a feasibility study check for a GPU or AI deployment?

We start at the rack. Can the site deliver about 120 kW or more to one rack position, with redundancy? Is there a liquid cooling pathway, with facility water and room for coolant distribution units? Will the floors carry dense racks? Can one hall take a full NVIDIA scalable unit of about 1.2 to 2 MW in one step? Then we test power, fibre, land, planning and access. NVIDIA figures as at October 2026.

05 How do you treat power claims in a study?

We rank them by the evidence behind them: energised spare capacity confirmed by a load study, a signed connection agreement with an energisation date, a connection offer, or an application in the queue. Time to first revenue is modelled on that ranking, not on the brochure.

Start small

Start with a regional screen.

Tell us the region and the load. Or call 0468 017 373.

Book a discovery call