Data centres
From a 25 kW edge node to a hyperscale campus, anywhere in Australia, proven before you commit.
Direct answer
Start with your IT load. Edge nodes run at 25 to 100 kW, clusters at about 400 kW, hubs from 1.3 MW and campuses at tens of megawatts. Each size suits a different kind of site. Divine Lab Worx is the consultancy arm of Sharktech Global.
Four sizes
Indicative planning figures. Confirmed site by site.
Vacated floors and small enclosures. Close to users.
One 40 ft enclosure. Yards and strong roofs.
Large yards. Typically a new high-voltage connection.
Large land parcels. Transmission-level power.
What every site needs
Headroom and a real connection date.
Diverse routes. Low latency.
Clear yard. Crane and delivery access.
A zone and pathway that allows the use.
Safe entry for build and operations.
Powered, connected sites first.
How we work
Most of the work happens at the desk.
Explore: data centres · supercomputers · critical infrastructure · existing network sites · edge sites · hyperscale campuses · feasibility study.
Load, hardware, cooling, regions and timeline.
Every candidate scored on five points.
Site profiles, supply outlook and risks.
Specialists confirm power, structure, planning and access.
Owners, dates and decision gates.
Credibility
We have run critical sites, not sold them.
Frequently asked
Short answers for operators, developers and investors.
Yes. From edge nodes to campuses. Anywhere in Australia.
Small. Edge nodes can use spare supply. Campuses need new transmission connections.
Far more than a traditional rack. In Uptime Institute’s 2026 survey, 69% of operators said their most common rack is under 10 kW. One NVIDIA GB200 NVL72 rack draws about 120 kW and is liquid-cooled. A site built for the first can fail the second, so we test power and cooling per rack.
Much bigger than what is built. AEMO’s 2026 Electricity Statement of Opportunities counts 225 data centre projects in development across the National Electricity Market, with 67 GW of combined capacity. Average data centre demand on the grid passed 700 MW by mid-2026, and 36% of projects in last year’s outlook have since been cancelled. Power decides which ones get built.
Yes. Existing powered, fibre-connected sites come first.
Your IT load, hardware, regions and target date.
Find your site
Tell us your load. We find the site. Or call 0468 017 373.