Edge node, 25 to 100 kW
Vacated floors or small enclosures. Usually no crane, subject to unit size and floor loading.
AI and GPU compute
Match your GPUs to sites that can power, cool and connect them.
Direct answer
Enough power, a way to cool it, crane and delivery access, and fibre close to users. We match each deployment to a site that can carry it. From a 25 kW edge node to a 1.3 MW hub. Divine Lab Worx is the consultancy arm of Sharktech Global.
Deployment tiers
Vacated floors or small enclosures. Usually no crane, subject to unit size and floor loading.
One 40 ft enclosure on a yard or strong flat roof.
Large yards. Typically a new high-voltage connection.
What we plan with you
Hardware profile, power draw and heat load.
Packaged air or liquid cooling, with condensers or dry coolers.
Crane lift plan, foundations and outrigger loads.
Acoustic design to meet night-time limits near homes.
Fibre, cross-connects and remote management.
Owned hardware, logged physical access and Australian jurisdiction.
Inner-city options
Inner-city sites rarely have yards. They can still host GPUs.
Small units through standard doors and goods lifts, subject to dimensions, mass and floor loading.
Enclosures on certified roofs with safe access and crane set-up.
GPU racks inside, with dry coolers and electrical plant on the roof.
Frequently asked
Clear answers for operators, developers and investors.
Not always. Many inference workloads suit edge nodes or clusters on existing, well-connected sites.
Yes, subject to structural certification, safe crane access and acoustic design.
It depends on rack density. Air-cooled 8-GPU servers draw about 10 to 15 kW each: up to 10.2 kW for a DGX H100 and about 14 to 15 kW for a DGX B300. Rack-scale GB200 and GB300 NVL72 systems draw about 120 kW or more and are liquid-cooled. We check heat rejection, water, noise and plant space for both.
It depends on the GPU generation. A 25 kW unit takes about two H100 or H200 servers (16 GPUs, up to 10.2 kW each) or one B200 or B300 server (8 GPUs, about 14 to 15 kW). Rack-scale NVL72 systems need about 120 kW or more. NVIDIA figures as at October 2026; your hardware profile confirms it.
Look beyond western Sydney's queue. Existing powered sites with spare supply in regional NSW, other capital cities and regional centres can host clusters sooner than a new build. We screen sites anywhere in Australia on power, fibre, land, planning and access, then shortlist the ones ready now.
No. We find suitable sites and prepare the case. The asset owner decides.
Divine Lab Worx's own managed delivery crew of inducted electrical, mechanical and facilities specialists, mobilised to any state, deploys and maintains GPU infrastructure. Divine Lab Worx is the consultancy arm of Sharktech Global, led by Chief Executive Officer Dainu Devis.
Find where it fits
Share your hardware profile and target region. Or call 0468 017 373.
Book a discovery call