A$32bn Western Downs
Power drove a regional site.
Case studies
Short data centre case studies on Australia’s largest data centre and supercomputer projects, built from public information.
Direct answer
These data centre case studies show that power came first. The winning projects chose sites with existing grid connections, nearby generation or ready land. Announced capacity often runs far ahead of what gets built. Divine Lab Worx is the consultancy arm of Sharktech Global.
At a glance
Public information as at October 2026. Divine Lab Worx was not involved in these projects.
Power drove a regional site.
An existing connection wins.
Announced is not built.
Modular units need ready sites.
Corridor sites carry grid risk.
Plan the site before the system.
Read the case studies
Start with the A$35 billion overview.
Data centre financing hits a record A$35 billion in 2026
Case study: the Anthropic data centre at Western Downs, Queensland
Case study: IREN Bundey and the value of an existing grid connection
Case study: Project Southgate, 1.6 GW announced and 42 MW built
Case study: NVIDIA AI factories in Australia and the race for power-ready sites
Case study: OpenAI NEXTDC sovereign AI campus at Eastern Creek
Case study: Australia’s next national supercomputer needs a site plan
Frequently asked
Short answers for operators, developers and investors.
No. They analyse public information about major Australian projects. Divine Lab Worx was not involved in them.
Power decides the site. Projects with existing grid connections or nearby generation move first.
Anthropic at Western Downs, IREN Bundey, Project Southgate, NVIDIA AI factories, OpenAI NEXTDC at Eastern Creek and the national supercomputers.
At least A$35 billion so far in 2026, a record, according to an RBA staff note reported in September 2026.