The situation
- Setonix: Pawsey, Perth. Online since 2022 and supported to 2028.
- Gadi: NCI, Canberra. Approaching a lifecycle decision.
- Funding: Pawsey and NCI say current funding is not sufficient.
- Cost: a Setonix replacement could cost four to five times the original build.
Why the supercomputer site matters
A new national supercomputer will draw far more power per rack than the systems it replaces. Most will need liquid cooling, and power quality has to be measured.
A Setonix replacement or a new Gadi may need more supply, stronger floors and new heat rejection. In some cases that means a new supercomputer site.
Lessons for research and government
- Plan the supercomputer site before choosing the system.
- Test supply, cooling and structure early.
- Consider sovereign, certified hosting for sensitive workloads.
How Divine Lab Worx would approach it
We test existing facilities and alternative sites for density, cooling and power quality. That way the next national supercomputer is not held up by its building. See supercomputer sites.
Planning a project like this? Divine Lab Worx finds sites that can actually be built, anywhere in Australia. Book a discovery call or call 0468 017 373.
Sources and further reading
This case study analyses publicly reported information as at October 2026. Divine Lab Worx was not involved in this project. Figures are as reported by the sources listed. Not financial, legal or engineering advice. Divine Lab Worx is the consultancy arm of Sharktech Global.