Data centre site intelligence

Data centre site selection across Australia.

Need a site anywhere in Australia? We find existing powered, fibre-connected infrastructure you can build on. We cut the time to build.

Direct answer

What does a data centre site selection consultant do?

Divine Lab Worx screens candidate sites anywhere in Australia for power, fibre, land, planning and access. We rank the strongest. Specialists prove them. Existing infrastructure comes first. Clients receive a build-ready shortlist in weeks, not months. Divine Lab Worx is the consultancy arm of Sharktech Global.

The problem

Finding the site is now the slowest part of the build.

Capital is available. Chips can be ordered. The constraint is a site with enough power, fibre, land and a clear approval pathway.

01

Grid queues run long

Connection requests now sit behind speculative applications.

02

Approvals vary

Planning pathways differ by state and council.

03

Good land is scarce

Sites near fibre and customers are limited and contested.

04

Late faults cost months

A substation without headroom found after signing costs time and capital.

Five-point screen

Every site tested on what actually stops a build.

Use what already exists. Australia has a large estate of secure, powered, fibre-connected buildings and yards. We find the ones that fit and help you secure them. Every arrangement is agreed with the asset owner.

01

Power

Substation headroom, planned upgrades and a realistic connection date. Confirmed by load study.

02

Fibre

Existing fibre and duct entry, route diversity and latency to the customers you serve.

03

Land

Clear yard area from the cadastre and aerial imagery, with crane, delivery and service clearances.

04

Planning

Zoning, overlays, noise limits and the consent pathway for the proposed use.

05

Access

Safe entry for construction, deliveries and ongoing operations, including site access rules.

06

Existing infra­structure

Secure, powered, fibre-connected buildings and yards that can shorten the path to first revenue.

How we work

From national screen to build-ready shortlist.

Most of the work is done at the desk, before anyone books a site visit.

Explore: power-ready sites · fibre-ready sites · data centres · supercomputers · critical infrastructure · existing network sites · edge sites · hyperscale campuses · feasibility study.

Read the data centre case studies.

01

National screen

The full universe of candidate sites from public data, not a broker list.

02

Land and access review

Lot boundaries from the cadastre. Yards, entry and crane areas from aerial and street imagery.

03

Supply and planning screen

Network planning reports for supply outlook. Zoning and overlays from state planning portals.

04

Expert due diligence

Power, structural, mechanical and planning specialists pressure-test the shortlist.

What you receive

Evidence you can take to a board.

01 / Shortlist

Ranked sites

Every candidate scored on the five-point screen.

02 / Profiles

Site profiles

Aerial and street views, yard area, access and setting.

03 / Supply

Supply outlook

Network operator outlook and flagged constraints for each site.

04 / Verify

Verification checklist

Electrical, structural, planning, crane, acoustic and ground items to confirm.

05 / Pilot

Path to pilot

Milestones, owners and decision gates.

06 / Speed

Faster to build

Brownfield sites with confirmed spare power and fibre can avoid new connections.

Who we work with

Built for the teams that need sites now.

01 / Operators

AI cloud and GPU operators

GPU capacity ordered, sites needed. See the AI cloud operators page.

02 / Developers

Edge and modular developers

Containerised and modular deployments on yards, roofs and vacated floors.

03 / Colocation

Colocation entrants

New halls and nodes close to enterprise customers.

04 / Enterprise

Enterprise and government

Sovereign hosting with owned hardware and logged access.

05 / International

Operators entering Australia

A site-led entry plan, approvals and tenant demand.

06 / Investors

Infra­structure investors

Independent site evidence before capital moves.

Faster to build

Greenfield versus existing infra­structure.

Indicative. Every site is confirmed by due diligence.

Item Greenfield build Existing infrastructure, screened first
Grid connection New connection, often the longest item on the programme. Existing supply first, spare capacity confirmed by load study.
Fibre New routes, trenching and permits. Existing fibre and duct entry where available.
Security New fence, access control and monitoring. Secure sites with established access control.
Approvals New use on new land. Pathway checked early. Submissions prepared to the asset owner's requirements.
Next site Starts again from zero. Same template, faster each time.

Before any site is offered

Eight checks. No shortcuts.

No site is offered until the right specialist confirms each item.

Meet the specialists who do this work on our team page.

01

Asset owner approval

Consent for the proposed use and agreed occupancy terms.

02

Electrical capacity

Load study of existing supply, and a connection enquiry if an upgrade is needed.

03

Structural sign-off

Roof and slab capacity for plant, enclosures and crane loads, certified by an engineer.

04

Live operations

Method statements, inductions and escorted access so nothing in service is disrupted.

05

Crane lift

Lift plan, crane selection, outrigger bearing and exclusion zones.

06

Services and road use

Underground and overhead services search, traffic management and road occupancy.

07

Planning pathway

Town planner review of zoning and permissibility.

08

Acoustic and ground

Acoustic assessment, plant placement, survey and geotechnical investigation.

Frequently asked

Data centre site selection, answered.

Clear answers for operators, developers and investors.

01 How do you choose a site for a data centre in Australia?

Screen every candidate on power, fibre, land, planning and access. Then confirm the shortlist with a load study, survey and planning review. Before any lease or order.

02 Can you find data centre sites anywhere in Australia?

Yes. City, regional and edge locations in every state and territory. Existing infrastructure first.

03 How long does site selection take?

A desktop screen and ranked shortlist typically takes weeks. Detailed due diligence on the preferred site follows.

04 What is the biggest risk in choosing a data centre site?

Grid connection. Spare capacity and connection timing should be confirmed before any commitment.

05 Do you only work in Sydney and Melbourne?

No. We screen sites in every state and territory, including regional hubs and edge locations.

06 Who approves the site?

The asset owner, network operator and consent authority. We prepare the evidence and submissions; approval remains their decision.

07 What does the first engagement cost?

Most clients start with a fixed-scope regional screen. Pricing is on application.

Find your site

Need a location anywhere in Australia?

Tell us your load and region. We will find existing infrastructure that fits. Or call 0468 017 373.