Equipment floors
Edge nodes from 25 kW.
Existing infrastructure
Australia has more than 20,000 secure, powered, fibre-connected network sites. Many now hold spare floor and yard space. We find the ones that fit.
Direct answer
They already have power, fibre and security. That removes the slowest greenfield steps. Spare capacity and owner approval are still confirmed for each site. Divine Lab Worx is the consultancy arm of Sharktech Global.
Why it works
Networks are modernising. Old equipment leaves. Space opens up.
Supply already connected.
Duct and fibre entry in place.
Controlled access already managed.
In suburbs and towns, close to users.
Small rooms to large yards.
Small and big
Indicative. Every site is confirmed by due diligence.
Edge nodes from 25 kW.
Enclosures on certified roofs.
Clusters around 400 kW.
Hubs from 1.3 MW.
Edge compute in every state.
Low latency near the CBD.
What still has to be proven
Explore: data centres · supercomputers · critical infrastructure · existing network sites · edge sites · hyperscale campuses · feasibility study.
Consent and occupancy terms from the asset owner.
Load study on existing supply.
Engineer sign-off for roofs and floors.
No disruption to services in the building.
Review of the new use.
Credibility
We have run critical sites, not sold them.
Frequently asked
Short answers for operators, developers and investors.
More than 20,000. They range from small equipment shelters to large city buildings.
No. Each is screened for power, space, access and planning. Only the strongest go forward.
No. We find suitable sites and prepare the case. The asset owner decides.
It depends on the site. Skipping a new grid connection and fibre build can save months.
Find your site
Tell us your load and region. We find the network site that fits. Or call 0468 017 373.
Book a discovery call