The project
- Operator: IREN.
- Capacity: an 800 MW campus.
- Location: near Bundey, about 125 km north-east of Adelaide.
- Power: an existing 800 MW transmission connection with four 330 kV feeder exits.
- Timeline: energisation expected from 2028.
- Ecosystem: named by NVIDIA in its 2 GW Australian AI factory program.
Why IREN Bundey stands out
Most projects wait years for a new grid connection. IREN Bundey started with an existing grid connection already in place, which takes the biggest delay out of the program.
The site also sits inside a planned transmission upgrade area. South Australia has a faster approval pathway for any South Australia data centre that meets its energy and water tests.
Data centre site selection lessons
- An existing grid connection is worth more than cheap land.
- Look at transmission hubs, not just cities.
- State policy matters. South Australia now lets preparatory works start before approval.
How Divine Lab Worx would approach it
Our data centre site selection screens for an existing grid connection first, whatever the size of the project. Then we test land, water and planning. IREN Bundey is a clear example of why. See existing network sites and power-ready sites.
Planning a project like this? Divine Lab Worx finds sites that can actually be built, anywhere in Australia. Book a discovery call or call 0468 017 373.
Sources and further reading
- W.Media, IREN targets Bundey transmission hub for 800MW campus (June 2026)
- NVIDIA Newsroom, NVIDIA expands AI infrastructure capacity with Australia’s data centre ecosystem (9 September 2026)
- Johnson Winter Slattery, evolving regulatory landscape across Australia (1 October 2026)
This case study analyses publicly reported information as at October 2026. Divine Lab Worx was not involved in this project. Figures are as reported by the sources listed. Not financial, legal or engineering advice. Divine Lab Worx is the consultancy arm of Sharktech Global.