The project
- Value: about A$7 billion.
- Location: the S7 campus, Eastern Creek, Western Sydney.
- Campus: planned at 650 MW.
- Cooling: closed-loop, high-density liquid cooling.
- Status: a non-binding OpenAI NEXTDC agreement, December 2025.
The site story
Western Sydney is the country’s main data centre corridor, and it is also where grid stress is highest. AEMO has flagged that one fault near western Sydney could cut about 1,500 MW of load by 2030. Any Western Sydney data centre has to plan for that.
NSW now asks large projects to cut load at peak times, contract renewables and use recycled water. Projects above 15 MW go through state significant development.
Lessons for operators and investors
- A Western Sydney data centre carries grid risk, so plan ride-through and demand response early.
- Liquid cooling helps a sovereign AI campus meet NSW water expectations.
- Non-binding deals need site evidence to close.
How Divine Lab Worx would approach it
We check sites against the NSW guidelines before you lodge, covering power, water, noise and community. The OpenAI NEXTDC plan shows how much rides on that work. See data centre site selection.
Planning a project like this? Divine Lab Worx finds sites that can actually be built, anywhere in Australia. Book a discovery call or call 0468 017 373.
Sources and further reading
- W.Media, OpenAI and NextDC unveil AUD 7bn plan for sovereign AI campus in Sydney (December 2025)
- K&L Gates, NSW Data Centre Guidelines published (23 September 2026)
This case study analyses publicly reported information as at October 2026. Divine Lab Worx was not involved in this project. Figures are as reported by the sources listed. Not financial, legal or engineering advice. Divine Lab Worx is the consultancy arm of Sharktech Global.